Description
autostrada a 14 tudor,The first part of the A14 opened to traffic was Bologna–Forlì (73 km) in 1966. The A14 reached the Rimini Sud junction on 13 August 1966; Riccione on .
Beige and white GG Supreme canvas
A14 (Italy)
Gold-toned hardware
Tutor attivi in autostrada 2024: dove sono e la mappa aggiornata.
Double G
Inside: 4 open pocket
Google Maps
Chain top handle with 7″ drop
Top zip closure
A14 (Italy)
7.7″W x 3.1″H x 1.2″D
Weight: 0.6lbs approximately
Tempi di percorrenza in A14